Advanced Timber Engineered Kit System
About the Advanced Timber Engineered Kit System
Our buildings have been designed using what is called a Design for Manufacture and Assembly (DfMA) approach, which simply means that the walls, floor and roof elements can be manufactured offsite in a clean and dry factory and transported to the site and then assembled.
The best part is that the assembly of the home typically takes about two days to lift and connect the panelised sections to a wind and watertight stage. After the kit has been erected by us the customer can then take over to fit out the building to their own standard, usually with trades taken on directly by the customer and completed in their own time.
Please note, we can also provide additional advice or other support during the kit stage; check out our services for more information.
Kit Package* | Turnkey Package | |
Architectural Design | ![]() | ![]() |
Structural Design | ![]() | ![]() |
Services Design | ![]() | ![]() |
Advanced Panel Design | ![]() | ![]() |
Planning Permission | ![]() | ![]() |
Building Warrant | ![]() | ![]() |
Groundworks | ![]() | ![]() |
Advanced Panel Manufacture | ![]() | ![]() |
Advanced Panel Kit Erection | ![]() | ![]() |
Airtightness Taping | ![]() | ![]() |
Window and Door supply and fit | ![]() | ![]() |
External Cladding and roofing supply and fit | ![]() | ![]() |
Mechanical and Electrical supply and fit (including PV’s MVHR, etc) | ![]() | ![]() |
Internal Fitout to client’s requirements | ![]() | ![]() |
*Please note that any service that is not typically included in the kit package can be added on as an extra service.
Testimonials about the kit manufacture and erection team
Thanks for making everything to do with the timber frame, so seamless and easy. It has been a pleasure to have you be part of our new home build.
Low energy home – January 2017
I’ve had a lot of complimentary comments on both the speed and quality of the build
Low energy home – March 2018
❝
I have to say it was one of the most enjoyable building experiences I have had watching your company erect the kit. You asked me some questions on Monday morning and that was the last time I was asked any questions. Your squad of 6 Joiners were probably one of the best squads I have had in a long time
Low energy home – December 2017
It is a sad truth, but a company that takes pride in its work for no other reason than it is the right thing to do is a rare find.
Low energy home – April 2018
Construction Gallery
Neat (UK) Ltd
The Construction Scotland Innovation Centre
3 Watt Place
Hamilton International Technology Park
Blantyre
UK
G72 0AG
